Project: Wateredge Development (Phase 3), Midleton, Co. Cork

Client: Mogeehy Holdings

Architects: Scott Tallon Walker

Contractor:N/A

Status:Planning Permission Granted 2009

Value: €40-50M

Description:

Phase 3 of the Development consists of the following:

River Bridge & Quay Wall

A two span concrete bridge will be constructed across the Owenacurra River and newly constructed flood channel. The bridge will accommodate both vehicular and pedestrian movement.

Residential Units

The residential element will comprise of 257 no. residential units in ten different blocks ranging in height from 2 storeys to 7 storeys. A basement car park and an amenity boardwalk will also be completed as part of this element.

DOSA were responsible for the civil / structural engineering element of the project to Planning Stage.

Denis O'Sullivan & Associates
Joyce House
Barrack Square
Ballincollig
Co. Cork
T: 021 - 4871781
F: 021 - 4874157
E: info@dosa.ie