Project: Pepsi Head Offices, Carrigaline Road, Co. Cork

Client: Cronin Buckley (Steel) & Jacobs International

Architects: N/A

Contractor
: Cronin Buckley (Steel)

Status
: 2001-2003

Value: €30M

Description:

The project involved the construction of a number of buildings. DOSA was engaged by Cronin Buckley Steel Fabrication to design the steel super structure as part of a design and build package. This included the following:

Main Production Building (single storey)
Area 15,000m2 - 3 span steel portal frame – 14m high with parapet.

Administration Building
Three storey with central atrium. Composite steel and concrete frame.

Facilities Building (single storey)
Area 2,400m2 - single span propped steel portal frame – 10m high with parapet.
The contract also included various ancillary structures including canopies and tanker sampling platforms.